Customized One-Stop Pre-sales Professional Support
We provide free tailored technical solutions before cooperation, including factory layout design, production line configuration optimization, raw material adaptability analysis, capacity calculation and project budget planning. We also arrange factory inspections and on-site visits to our running global projects, offering reliable investment reference for your pellet, feed and food manufacturing projects.
Strict Pre-delivery Inspection & Reliable Global Delivery Service
All equipment undergoes no-load and material-running tests in our standardized workshop before shipment, complying with domestic and international quality standards. We adopt reinforced export packaging, provide complete customs clearance documents and full logistics tracking, to guarantee your machines arrive intact and pass local import inspection smoothly.
Overseas On-site Commissioning & Systematic Operator Training
Our professional engineers are dispatched worldwide to complete on-site equipment installation, whole-line debugging and trial production. We deliver systematic training covering equipment operation, parameter adjustment, daily maintenance and fault troubleshooting, enabling your team to independently operate and maintain the production line to reach designed stable output quickly.
Standard Warranty Plus Lifelong Technical & Spare Parts Support
We offer 1-year full machine warranty for all equipment (excluding wearable parts). Beyond the warranty period, we provide 24/7 remote technical consultation, lifelong preferential supply of original spare parts, as well as free long-term process and formula guidance when you switch product types, fully safeguarding your continuous stable production.
Our story is built into every machine.
Main Service Process
As your dedicated project partner, we deliver full EPC turnkey solutions covering the entire project cycle from initial planning to factory commissioning. We handle every stage of your pellet production line in-house, ensuring stable supply chain management, shortening your project schedule and cutting your overall investment costs.





Our story is built into every machine.
Other Service
Sincerity and modesty define our service commitment. We offer full-lifecycle support for your equipment and technical needs with timely, flexible assistance. Our global service network guarantees stable supply of machinery and spare parts worldwide.
01
Equipment Delivery
02
Fabrication Services
03
PARTS
Available
RICHI Crafted, Fully Trusted.
Project Cases
RICHI has accumulated numerous successful project cases through our dedicated full-service support.
RICHI Crafted, Fully Trusted.
Why Choose Us?
Reliable, hassle-free and reassuring — these are the hallmarks of RICHI.
Your challenges, our solutions.
FAQs

What free pre-sales technical services can you provide before we sign the contract?
We offer one-stop free pre-sales support including factory layout design, production flow planning, raw material formula guidance, capacity and power consumption calculation, customized equipment configuration and detailed project quotation. We can also arrange factory visits or field inspections of our local running projects for you to check real equipment operation and finished pellet quality.

Will you test the machines before shipment? What quality inspections are carried out?
All equipment will undergo strict no-load test and material-running test in our standardized workshop before delivery. Core components are self-manufactured with wear-resistant alloy steel, complying with Chinese national standards and European & American quality norms. We will record test data and provide inspection reports for your reference.

What operator training content will you provide on site?
We deliver systematic training covering equipment standard operation, process parameter adjustment, daily maintenance, common fault troubleshooting and wearing parts replacement. After training, your operators will master full skills to independently run and maintain the pellet line. We also offer operation manuals and video tutorials for later review.

How can we get technical support if the equipment breaks down after installation? What is your response speed?
We provide 24/7 global remote technical support via email, WhatsApp and video call to solve most failures rapidly. For complex breakdowns, we will arrange professional engineers to guide on-site repair as soon as possible. We also conduct regular follow-up visits to check equipment running status and offer maintenance reminders.